TW Electrical are pleased to announce the commencement of

New Electrical and Mechanical systems Installations at Grade 2 listed Milner Hall in Winchester 

 

 

Milner Hall Grade 2 listed

Milner Hall Grade 2 listed Electrical and Mechanical installation

Very Brief History;

The Building is Grade 2 listed, The former St Peter’s Chapel, now known as the Milner Hall, lies tucked away between St. Peter Street and Jewry Street. For more than three hundred years it was hidden from passing view by a heavy black door. The door was recently replaced by an elegant wrought iron gate through which the Hall stands framed by the arch. The plaque on the wall of 9 St Peter Street which, with its neighbours, 7 and 8, stands on the site of the first “St Peter’s House”, commemorates Rev John Milner, the eminent churchmman, scholar and historian, who built the Chapel in 1792.

 

We are installing a complete new Electrical system

Comprising of the removal of all existing system, Re location of the supply meter 

Installation of new mains distribution

New lighting with Central battery system, this is to enable the emergency lighting to be provided without the need for larger luminaires and local battery packs.

Wiring and containment for AV hearing aid loops and future data system 

Small power systems 

Fire alarm modifications and upgrades

We are installing a complete new Mechanical heating and Domestic hot and cold water system

New boiler plant and pump sets are being installed 

New Decorative radiators, Toilets and Sanitary-ware along with services to kitchenette 

The works also include mechanical ventilation.

Completion is due in October of this year